PROJECT 951
A Project 951 project · for commissioning and maintenance technicians

The Last Attempt

Commissioning Diagnostic Guide. A visual diagnostic guide, five Excel logs and ten project templates. Built for the field: the order to check things, the values to measure and where to record them. Every value shows its source.

Cover of The Last Attempt: Commissioning Diagnostic Guide
Products

Pick what you need

Instant download. PDF and Excel files, no subscription.

Templates

The Last Attempt: Commissioning Starter Kit

Ten Excel templates that share the same look and logic, from FAT to handover.

  • Punch list, FAT and SAT checklists
  • I/O loop check register
  • Daily and weekly reports
  • Drives log, maintenance plan
  • Safety verification, backup register
€7910 templates, €222 bought separately
Get the Kit
Guide + logs

The Last Attempt: Commissioning Diagnostic Guide

115 pages of flows, cards and tables, plus five Excel logs to record what you measure.

  • 14 chapters, from method to SAT and intermittent faults
  • Siemens and ABB examples
  • Cable, VFD, analog, network and panel logs
  • Values with their sources
€39PDF + 5 Excel logs
Get the Guide
Best value

Complete Bundle

The Guide and the Starter Kit together: documentation for the project and answers for the fault.

  • Everything in the Kit
  • Everything in the Guide
  • One purchase, one download
€99€118
Get the Bundle

Prices in euros. Final links and launch prices to be confirmed.

Inside the guide

Made to be scanned on site

Flow charts, symptom cards and tables, not walls of text. Each chapter ends with a checklist, safety notes and its sources.

Insulation resistance chapter page
Insulation resistance: the minimum, the test and the decision.
Analog signals chapter page
Analog signals: ten checks before you power the loop.
Site acceptance test chapter page
Site acceptance test: the sequence and where each check is detailed.
Cable insulation test log
Cable insulation log: automatic pass or fail.
Analog loop sheet
Analog loop sheet: 4, 12 and 20 mA with automatic error.
Punch list tracker
Punch list tracker: days open and overdue flags.
Free sample

Chapter 5: Analog Signals

The 4-20 mA chapter as a free PDF: the ten checks before you power the loop, the counts on a Siemens input and a 4-20 mA loop explained in volts. Enter your email and it is yours.

Send me the free chapter

No spam. One email when something new is published.

About Project 951

Why 951?

Most things that work came after many attempts that did not. Project 951 is built on that idea: 950 failures, and the 951st works. We write down the attempts that worked as clear tools and defined sequences, so the next person gets there sooner.

The Last Attempt is the first project. It is for the commissioning or maintenance technician with a multimeter in one hand and the manual in the other: the order to check things, the values to measure and where to record them.

Independent. Not affiliated with, or endorsed by, any equipment manufacturer. Siemens and ABB are trademarks of their owners.

FAQ

Questions

Where do the values come from?

From standards and manufacturer manuals, listed at the end of each chapter. Always check them against the documents of your own equipment and project: the specification comes first, then the manufacturer, then the standard.

Does this replace the manual or my safety procedures?

No. The guide and templates are working aids. They do not replace the manufacturer's documentation, the applicable standards, your risk assessment or your site's safety rules.

What do I get after paying?

An immediate download link: the PDF guide and the Excel files. Files open in Excel 2016 or newer.

Can I adapt the templates?

Yes. They are plain .xlsx files: rename, extend and adapt them to your own procedures. Redistribution or resale is not allowed.

Refunds?

See the refund policy.